27.05.24 | Vollzeit, Freelancer | Tübingen | www.freelance.deConsideration of Construction Driven Execution (CDE). • The level 4 and level 5 planning of the contractor will be reviewed. • The prioritizing and follow-up of the Construction Work Packages (CWP) and Installation Work Packages (IWP) will be carried out together with the yard engineering team. • The planning
Später ansehenVerpassen Sie nie wieder einen passenden Job!
Alle Jobs für Industrial Engineer in Tübingen Landkreis kostenlos abonnieren.